Luke Boorer Carpets
 

Floor Preperation

Shadow

It is essential that a floor is correctly prepared before your floor covering is installed.

Wherever possible, we will inspect the quality of the floor when we visit for an estimate. We will then advise you what, if anything, needs to be done prior to the floor covering being installed.

If we feel we need to bring the floor up to a satisfactory standard we will inform you of this and advise you of the cost. This preparation work may including hard-boarding, ply-boarding or applying a self-levelling compound (known as screed). Sometimes screed can take up to 6 hours to dry which means a delay in fitting, but we do try to inform you this prior to our arrival.

Contact Information

Our Location


Phone:

Email:
Twitter:


+44 (0) 7946 449378

lukeboorer@hotmail.com
twitter.com/LBCarpets